SECTION 2 - EARTHWORKS |
Excavation and subgrade formation preparation |
55,000 m3 |
|
SECTION 4 - FLEXIBLE SURFACING |
Interlock Tiles |
100,000 m2 |
Asphalt |
53,000 m2 |
Traffic Signs & Road Marking |
112 No. & 17623 m |
|
SECTION 5 - KERBING |
Raised, Flush, Edge & Dropped Kerbs |
19,000 l.m |
|
SECTION 7- SURFACE WATER DRAINAGE |
Soakaways |
39 No. |
Gullies |
514 No. |
Pipe Lines & Manholes |
6500 l.m & 41 No. |
Trench Soak-away |
5962 l.m |
|
SECTION 10B - ELECTRICAL WORK |
Cabling |
190 l.m |
Ducts |
1785 l.m |
|
SECTION 10C - STREET LIGHTING WORKS |
Light Poles |
206 No. |
Cabling |
6600 l.m |
Ducts |
372 l.m |
|
SECTION 10D - Q - TEL WORK |
PVC Ducts |
435 l.m |
Chambers |
26 No. |
Q-Tel Testing & Commissioning |
L.S |
|
SECTION 10E - QGE & WC (WATER WORKS) |
Pipe Lines Dia. 50mm to 250mm |
4425 l.m |
|
SECTION 10F - SEWERAGE WORKS |
Pipe Lines Dia. 150mm & 200mm |
1325 l.m |
Steel Tanks |
2 No. |
Pumps & Pump Rooms |
2 No. |
|
SECTION 13 - RELOCATION WORKS |
Adjustment of Existing MH’s |
L.S |
|