| SECTION 2 - EARTHWORKS |
| Excavation and subgrade formation preparation |
55,000 m3 |
|
| SECTION 4 - FLEXIBLE SURFACING |
| Interlock Tiles |
100,000 m2 |
| Asphalt |
53,000 m2 |
| Traffic Signs & Road Marking |
112 No. & 17623 m |
|
| SECTION 5 - KERBING |
| Raised, Flush, Edge & Dropped Kerbs |
19,000 l.m |
|
| SECTION 7- SURFACE WATER DRAINAGE |
| Soakaways |
39 No. |
| Gullies |
514 No. |
| Pipe Lines & Manholes |
6500 l.m & 41 No. |
| Trench Soak-away |
5962 l.m |
|
| SECTION 10B - ELECTRICAL WORK |
| Cabling |
190 l.m |
| Ducts |
1785 l.m |
|
| SECTION 10C - STREET LIGHTING WORKS |
| Light Poles |
206 No. |
| Cabling |
6600 l.m |
| Ducts |
372 l.m |
|
| SECTION 10D - Q - TEL WORK |
| PVC Ducts |
435 l.m |
| Chambers |
26 No. |
| Q-Tel Testing & Commissioning |
L.S |
|
| SECTION 10E - QGE & WC (WATER WORKS) |
| Pipe Lines Dia. 50mm to 250mm |
4425 l.m |
|
| SECTION 10F - SEWERAGE WORKS |
| Pipe Lines Dia. 150mm & 200mm |
1325 l.m |
| Steel Tanks |
2 No. |
| Pumps & Pump Rooms |
2 No. |
|
| SECTION 13 - RELOCATION WORKS |
| Adjustment of Existing MH’s |
L.S |
|