SECTION 7 - EARTHWORKS |
Excavation |
320,580 m3 |
Formation preparation |
704,990 m2 |
|
SECTION 7 - FLEXIBLE SURFACING |
Interlock Tiles |
504,780 m2 |
Asphalt (Base & Wearing Course) |
260,174 m2 |
Road Marking |
99145 l.m
|
Traffic Signs |
1761 No. |
|
SECTION 7 - KERBING |
Raised, Flush, Edge & Dropped Kerbs |
197,317 l.m |
|
SECTION 7 - STREET LIGHTING WORKS |
Light Poles |
1735 No. |
Cabling |
85,090 l.m |
Ducts |
30,215 l.m |
|
SECTION 10 - SURFACE WATER DRAINAGE |
Manholes |
835 No. |
Gullies |
3441 No. |
Pipe Lines & Gully Line |
48403 l.m |
Trench Soak-away |
36274 l.m |
Microtunling |
1608 l.m |
|
SECTION 11 - SEWERAGE WORKS |
Pipe Line Including house connections |
1315 l.m |
Manholes |
47 nr |
|
SECTION 12 - TSE |
HDPE Pipe Line |
10777 l.m |
Chambers |
86 nr |
|
SECTION 13 - ELECTRICAL WORKS |
LV Cabling |
3800 l.m |
Ducts |
4500 l.m |
|
SECTION 13 - Q - TEL WORKS/QNBN |
PVC Ducts |
112360 l.m |
Chambers |
669 No |
|
SECTION 13 - QGE & WC (WATER WORKS) |
Pipe Lines Dia. 100mm to 300mm |
4408 l.m |
|