Roads and Infrastructure in West Muaither Al Manaseer

Project Info

Project Title Roads and Infrastructure in West Muaither Al Manaseer - DW002 Package 1
Name of Client Public Works Authority
Name of Consultant Dar Al Handasa
Contract Price 597 Million Qrs
Contract Duration 16 August 2015 to 23 December 2018

Project Details

SECTION 7 - EARTHWORKS
Excavation 320,580 m3
Formation preparation 704,990 m2
SECTION 7 - FLEXIBLE SURFACING
Interlock Tiles 504,780 m2
Asphalt (Base & Wearing Course) 260,174 m2
Road Marking 99145 l.m
Traffic Signs 1761 No.
SECTION 7 - KERBING
Raised, Flush, Edge & Dropped Kerbs 197,317 l.m
SECTION 7 - STREET LIGHTING WORKS
Light Poles 1735 No.
Cabling 85,090 l.m
Ducts 30,215 l.m
SECTION 10 - SURFACE WATER DRAINAGE
Manholes 835 No.
Gullies 3441 No.
Pipe Lines & Gully Line 48403 l.m
Trench Soak-away 36274 l.m
Microtunling 1608 l.m
SECTION 11 - SEWERAGE WORKS
Pipe Line Including house connections 1315 l.m
Manholes 47 nr
SECTION 12 - TSE
HDPE Pipe Line 10777 l.m
Chambers 86 nr
SECTION 13 - ELECTRICAL WORKS
LV Cabling 3800 l.m
Ducts 4500 l.m
SECTION 13 - Q - TEL WORKS/QNBN
PVC Ducts 112360 l.m
Chambers 669 No
SECTION 13 - QGE & WC (WATER WORKS)
Pipe Lines Dia. 100mm to 300mm 4408 l.m